Electrification of business

Electrification of businesses involves replacing fossil fuels such as gas and oil with electricity in operations, heating, and selected processes. For many Danish companies, this is a technological shift that is typically implemented in phases over several years so that operations can continue during the transition. At the same time, the electricity grid, standards, and upcoming EU requirements are setting new frameworks that make planning and documentation crucial. Here you will find an overview of concepts, technologies, processes, economics, support, and typical pitfalls, so you can make informed decisions and avoid the classic stumbling blocks.

What electrification of business means in practice

Electrification of business is a transition from energy forms based on combustion or mechanical power to solutions that primarily use electricity. In practice, this often means replacing natural gas or fuel oil with electricity-based technologies – especially for process heating, space heating, and facility operations.

It is important to distinguish between electrification and general energy efficiency improvements. Energy efficiency improves existing systems (e.g., insulation), while electrification is a technological shift. In many organizations, the two tracks run side by side: You can reap quick gains with efficiency improvements, while electrification requires clarification of power requirements, operating scenarios, and grid connection.

For most companies, electrification is not an "all at once" project. A phased approach makes it possible to replace equipment gradually, test solutions in practice, and adapt skills, service agreements, and spare parts without putting unnecessary pressure on production and deliveries.

Direct and indirect electrification of businesses

The electrification of a business can be roughly divided into two tracks. The distinction is practical because it affects complexity, efficiency, and documentation requirements:

  • Direct electrification: Direct replacement of fossil energy sources with electricity – typically via industrial heat pumps or electric boilers.
  • Indirect electrification: Green electricity is converted into another energy product (e.g., green hydrogen via electrolysis) for use in processes or sectors where direct electrification is not practical.

Direct electrification is typically the most straightforward approach and will often be cheaper than using hydrogen and other Power-to-X fuels because there is energy loss in the conversion to hydrogen. In practice, this means that many companies first assess whether heating and process requirements can be met by electricity-based solutions with acceptable temperatures, space requirements, and operating times before moving on to indirect solutions.

Electrification of businesses in Denmark: Electricity grid and pace of implementation

Denmark's electrification rate was 18.8% in 2023, calculated on the basis that electricity consumption accounted for 36 TWh of total energy consumption. The electrification rate rose further in 2024 by approximately one percentage point, driven in part by electric cars and heat pumps.

At the same time, the electricity grid is close to its capacity limit in several places. For you, this means that grid connection is not just a formality, but part of the critical path of the project. If the power requirement changes, it can affect both the schedule and the budget, so dialogue with the local grid company should take place early in the process.

A practical approach is to get an overview of your current and expected maximum power consumption and how it is distributed throughout the day and week. When you can describe "when" you use electricity – not just "how much" – it becomes easier to clarify capacity requirements and assess whether there are opportunities to shift consumption over time.

Rules and compliance for the electrification of businesses

EU building requirements and electrification of businesses in commercial premises

The revised EU Buildings Directive (EU/2024/1275) entered into force on May 28, 2024, and must be transposed into Danish law by May 29, 2026. For non-residential buildings, gradual minimum standards for energy performance will be introduced.

For commercial buildings, this means that they must have energy label F by 2027 and energy label E by 2030 in order to remain in operation as commercial premises.

In practice, it can be advantageous to link building requirements to your electrification plan. When you are working on heating, ventilation, or electrical installations anyway, you can typically document the changes more comprehensively and avoid "patching" with isolated measures that will later need to be rebuilt.

Standards and documentation in the electrification of businesses

Electrification must be carried out in accordance with applicable safety standards. In Denmark, the DS/HD 60364 series is used for electrical installations, and DS/EN 62477-1 is central to safety requirements for power electronics (e.g., heat pumps, inverters, and pumps).

A practical point in projects is to clarify compliance early on: which standards apply, who documents what, and how dimensioning, installation, and maintenance are gathered and handed over to operations. This is often where projects lose momentum if roles and interfaces (between consultant, installer, supplier, and operations) are not clearly defined.

As a rule of thumb, you should ensure that documentation and responsibilities are not only "in place" at commissioning, but can also be used in daily operations: Who can change setpoints? Who logs errors? How is service handled, and how does it affect warranty and safety? These are operational answers that typically need to be clear before the technology feels safe to roll out on a larger scale.

Technologies for business electrification: Heating and process

Industrial heat pumps in the electrification of businesses

Industrial heat pumps are a key technology for the electrification of heating needs, especially at supply temperatures below 100 °C. Their efficiency is typically around three times higher than fossil fuel alternatives, which can make a significant contribution to energy efficiency.

To assess the relevance in your operations, it is useful to clarify three factors: what temperatures you actually need, how stable your heating requirements are, and whether there are suitable heat sources (e.g., process surplus heat) available to raise the temperature. The better the match between temperature requirements and operating patterns, the more robust both the dimensioning and operation will be.

However, there are limits: for processes above 200 °C, there is currently no commercial heat pump solution. In such cases, alternatives such as Power-to-X may be relevant, or planning can be done in phases while awaiting technological developments. A phase plan could, for example, be to electrify the lower temperature stages first and maintain a temporary solution for the highest temperatures until there is a technical and economic basis for the next step.

Electric kettles as part of the electrification of businesses

Electric kettles provide simple and direct electrification of heat by converting electricity into heat with high efficiency (close to 100%). They can be relevant when high temperatures are required or where heat pumps cannot deliver sufficient temperature. On the other hand, they can be expensive to operate because they do not provide the same efficiency gains as heat pumps.

In practice, electric kettles often become most interesting when you have clear guidelines for operating time, power consumption, and electricity price risk. Therefore, the electric boiler should not only be assessed as a "heat source," but as part of an overall operating strategy: When can it run, what do you do during peak loads, and how do you ensure that the solution does not create a power problem in the installation or at the grid connection?

Power to X and green hydrogen through business electrification

Power-to-X is based on electricity splitting water into oxygen and hydrogen through electrolysis. Green hydrogen is hydrogen produced using renewable energy. PtX is particularly relevant where direct electrification is not sufficient, e.g. in high-temperature processes and parts of heavy transport.

Denmark has a political target of 4 to 6 GW PtX capacity by 2030. For individual companies, the general rule is that direct electrification is often considered first, and PtX is chosen if direct solutions are not technically or economically feasible.

If you end up evaluating the PtX track, it is typically worth being clear about which part of your process actually requires it. This can simplify the requirements specification and subsequent documentation, because you avoid "oversizing" an indirect solution for needs that could be covered more directly.

Electrifying your business: A practical four-step process

A structured approach reduces risk and makes the decision more robust. Use the steps as a simple checklist that can be shared across operations, finance, and management:

  1. Determine whether electrification is realistic: Assess maturity, operational impact, and whether alternatives such as biofuel are more relevant in the short term. Start by mapping the largest consumption items, their temperature requirements, and how critical they are to production.
  2. Build a business case: Include investment, operation, savings potential, subsidies, and consequences for production continuity and quality. Be sure to describe assumptions clearly (e.g., operating hours, electricity price level, service) so that the business case can be revised when you receive new data.
  3. Create a roadmap: Plan purchases, renovations, implementation, and testing. Involve the network company early on due to capacity requirements. A good roadmap also describes how you will handle downtime, temporary solutions, and handover to operations.
  4. Set a realistic timeline: Not all technologies are mature; in some cases, full transition requires several phases. Build in decision points where you can pause and assess whether the next phase still makes sense technically and financially.

When the process is clear, it becomes easier to prioritize the right data first and avoid spending time on details that will only be relevant later in the process.

Economics and support for business electrification

The price of electricity plays a key role in the business case. Average electricity prices are estimated at DKK 633/MWh in 2025 and DKK 529/MWh in 2050. At the same time, electricity prices can be volatile, and periods of very low or even negative prices are expected when there is high production from renewable energy. This makes consumption flexibility more relevant.

For you, the financial aspect is therefore not just about the "kWh price," but about your ability to control when consumption occurs. If a process can be moved or planned more flexibly, it can make the solution more robust to fluctuations and at the same time reduce the risk of dimensioning for rare peak loads.

The business fund provides subsidies for projects that save energy or reduce CO₂ emissions from energy use. The fund totals DKK 3.5 billion until 2029, and subsidies can cover up to 50% of the costs, depending on the size of the company (small companies up to 50%, medium-sized companies up to 40%, large companies up to 30%). You can apply for a minimum of DKK 50,000 and up to DKK 112 million. The subsidy is calculated as either 10 øre per kWh saved per year over the lifetime or DKK 500 per ton of CO₂ saved per year over the lifetime (automatically the higher amount). The fund does not provide subsidies for solar cells.

If you want to prepare for a support process, it is typically advantageous to have a clear understanding of what triggers the savings, how they are measured, and how the service life and operating conditions are described. This makes it easier to argue for the project's impact and reduce friction when gathering documentation.

Flexible electricity consumption in business electrification and typical pitfalls

Flexible electricity consumption is when a company temporarily changes its consumption in response to a price signal or a system challenge – manually, automatically, or through an agreement with a market participant. The potential in Denmark is estimated at 380-760 MW, primarily in companies, buildings, electric cars, and industry.

Flexibility is most useful when it is planned into operations: Which consumption can be moved without compromising quality, delivery, or the working environment? And who has the authority to change operations when a signal is received? These are clarifications that make the difference between theoretical potential and a solution that works in everyday life.

Typical pitfalls in electrification and flexibility are:

  • Data measurement and documentation: Without adequate measurement, it can be difficult to document changes and participate in markets. Start by clarifying which measurement points are necessary to monitor both energy consumption and power draw.
  • Organization: Solutions that depend on individuals and ad hoc arrangements become fragile. Ensure fixed procedures and a clear division of roles between operations, energy managers, and management.
  • Managing expectations: Unrealistic demands regarding response time and scope create conflicts between operations and management. Describe in advance what can be regulated, how quickly, and what limitations apply.
  • Grid capacity: Lack of early coordination can trigger delays or costly upgrades. Clarify the framework early on, especially if electrification increases maximum power.
  • Compliance: If standards and documentation responsibilities are clarified late in the process, handover to operations can be difficult. Make a plan for how requirements, testing, and documentation will be compiled so that operations have a usable basis.

If you take these points into account early on, the electrification of your business will be easier to manage as a comprehensive program rather than a series of individual projects.

FAQs about electrifying your business

  • What is business electrification? It is a transition from fossil fuels and combustion-based solutions to electricity-based technologies, typically for heating and selected processes.
  • What is the difference between direct and indirect electrification? Direct electrification uses electricity directly (e.g., heat pumps/electric boilers). Indirect electrification converts electricity into, for example, green hydrogen via electrolysis.
  • Which technologies are most commonly used for heating electrification? Industrial heat pumps (especially below 100 °C) and electric boilers (simple direct heating, also for higher temperature requirements).
  • What challenges can the power grid pose when electrifying a business? In many places, the power grid is close to its capacity limit, so grid connection and capacity clarification can affect both the schedule and costs.
  • What requirements may apply to commercial buildings in the coming years? Commercial buildings must have an F energy rating by 2027 and an E energy rating by 2030 in order to remain in operation as commercial premises.
  • What support can companies apply for in relation to electrification? The business fund (DKK 3.5 billion until 2029) can provide subsidies, typically depending on the size of the company, and calculated on the basis of energy savings or CO₂ savings.

Contact us

Do you have questions or need advice? Our experts are ready to help you.

Contact support

If you would like to contact support, please call +45 35 153 123 or send an email to support@xolta.com.

Contact sales