Energy storage and solar cells are closely linked when you want to increase your own utilization of your electricity production and create more stable operation in an energy system with large fluctuations in both production and consumption. Solar cells typically produce the most in the middle of the day, while consumption is often in the morning and evening – and this is where storage can make a noticeable difference. At the same time, technical requirements, regulations, and component quality can have a major impact on both operational reliability and economics. Here you will find a sober overview of technology, economics, regulations, and typical pitfalls, so you can make an informed decision and plan a realistic project process.
Energy storage can be defined as collecting energy produced at one point in time for use at a later point in time – typically to offset imbalances between production and consumption. In Denmark, energy storage and solar cells are increasingly becoming an integral part of the energy system, with solar cells increasing the share of renewable energy and storage contributing flexibility and balancing.
In 2025, there were approximately 126,000 small solar cell systems installed in private homes and businesses in Denmark, and in 2025 alone, around 25,000 new solar cell systems were installed. The market is also moving towards more storage: Batteries – especially lithium iron phosphate (LiFePO4) – are becoming more prevalent in new solutions, and experience from neighboring countries indicates that batteries are often considered a natural part of new installations.
In practice, the combination is all about timing: when solar cell production and your consumption do not match, there is a "gap" where you either have to sell the surplus or buy electricity later. Energy storage is a tool for shifting energy in time so that more of the solar energy produced can be used when the need is greatest.
Solar cells convert sunlight into electricity via the photovoltaic effect. The two dominant silicon-based technologies are monocrystalline and polycrystalline panels. The choice typically depends on the area, expected output, and which panel type best suits the space available and production requirements.
Solar cell systems typically have a lifespan of 25–30 years under normal conditions. However, over time, there will be a decline in performance (degradation), which you should factor into your production expectations and business case. It is a good idea to document the assumptions used in the calculations so that you can compare estimates with actual production after commissioning.
Battery storage in the form of Battery Energy Storage Systems (BESS) stores electricity in batteries and delivers it again via inverters when needed. In a combined setup with energy storage and solar cells, inverter control is central because it determines when the battery charges and discharges and how the system responds to changes in production and load.
For stationary energy storage and solar cells in homes and small businesses, LiFePO4 has become a standard solution. A LiFePO4 battery can typically deliver around 200 W/kg in specific power, which is well suited to systems that require fast response times. In practice, "fast response" means that the battery can support consumption when the load changes and that you can move energy from sunny hours to hours with lower production.
Batteries degrade over time and with use. Typically, around 10% degradation is seen in the first year, followed by a more gradual decline. The risk of faster degradation increases with high power loads, deep discharges, and operation at extreme temperatures. Operating at 100% depth of discharge (DoD) can reduce cycle life by around 50% compared to 50% DoD. To reduce wear, it is typically recommended to avoid overcharging above 100% State of Charge (SoC) and deep discharging below 10% SoC. Modern Battery Management Systems (BMS) are designed to reduce these risks.
If you want to reduce wear and tear in daily operation, it is often more effective to prioritize stable operating windows and reasonable limits rather than "draining" the battery as much as possible. This is also where sizing and control strategy become crucial: a battery that is too small for the load can be pushed to deeper discharges and higher loads, which can increase degradation.
Thermal energy storage stores energy as heat and can be relevant as a supplement to energy storage and solar cells – especially where heat consumption accounts for a large part of energy requirements. In many cases, it is a matter of utilizing surplus electricity from solar cells more practically by converting the energy into heat when it suits operations.
For small and medium-sized systems, sensible heat storage is often the most practical solution, e.g. water tanks or stone storage, which are heated using surplus electricity from solar cells or heat pumps. In Denmark, there has also been a focus on ice storage technology, where cooling systems freeze ice in tanks when there is a surplus of electricity.
To aid your decision-making, it is a good idea to clarify how much of your energy consumption can actually be "shifted" via heat, and when the need arises. This makes it easier to assess whether thermal storage should be seen as an alternative, a supplement, or simply a minor optimization around peak loads.
Prices for solar cells have fallen significantly over time. From 2010 to 2020, the price fell by 96% per watt, and from 2020 to 2026, prices will continue to fall. In 2026, the price of a complete solar cell installation for a detached house will be around DKK 25,000–180,000, depending on size, efficiency, and type. The price per square meter will be approximately DKK 1,500–4,000, and the price per kWh will be DKK 0.50–1.20.
An example from the market is a typical 6 kW solar cell system for a four-person household, where prices start at around DKK 95,000. The system often consists of approximately 20 panels with a total area of around 36 m² and an expected annual production of around 6,000 kWh for monocrystalline panels. The payback period for a 6 kW solar cell system without a battery is typically around 10 years, based on an electricity price of DKK 2.32/kWh and the assumption that the solar cells cover 65% of consumption.
When assessing the economics of energy storage and solar cells, it is advantageous to break down the calculation into a few transparent assumptions: (1) expected production, (2) your consumption pattern, (3) how much of the production you can use directly, and (4) what changes if you add storage. This makes it easier to see whether the gains come primarily from higher self-consumption, better adaptation to operating times, or more stable consumption during hours with higher electricity prices.
Batteries have become significantly cheaper. A typical 10 kWh home battery can be purchased for around DKK 60,000, including installation. For businesses, batteries can also play an additional economic role through system services: Batteries can participate in Energinet's market for system services and receive payment for providing flexibility to the electricity grid.
If you are considering system services, it should be clarified early on how management prioritizes between own use and the provision of flexibility, as well as what requirements this entails. It is often in the practical details—documentation, set points, and operating limits—that the potential is either realized or diluted.
There is a fund for solar cells on multi-story residential buildings with support of:
The bullet list can be used as a quick checklist to assess whether your case falls within the scope at all. The next step is typically to compare the requirements with the size of the project, ownership, and financial setup, so that you avoid designing a facility that later turns out to be ineligible for support.
As support schemes are subject to change, you should clarify conditions and deadlines early on in the project as part of your planning. This also applies to documentation requirements, as this is often where projects lose time if the conditions are not agreed upon from the outset.
In Denmark, there are technical requirements for connecting electrical energy storage facilities to the grid. Energinet's Technical Regulation 3.3.1 describes the requirements that batteries must meet in order to be connected to the distribution grid. Revision 3 will apply from January 1, 2023, with editorial corrections and changes made at the request of the Danish Energy Regulatory Authority. Batteries must meet these requirements regardless of size, and smaller battery types on the "Positive List" are assumed to meet the requirements as a starting point.
Connection typically requires a separate connection cable from the battery to the connection point designated by the electricity network company. If the battery is integrated into a building with other electricity customers, it can in some cases be connected with a shared connection cable, but this requires that there is only one building according to the BBR register. Before the battery can receive or supply energy, the electrical installer must provide documentation that the technical requirements have been met.
For you, this means in practice that grid connection is not just an "optional extra" at the end, but part of the design: Where should the battery be connected, what documentation is required, and who is responsible for compiling it? The sooner you clarify this, the lower the risk of changes, extra work, or delays in commissioning.
At EU level, the Battery Regulation will apply from August 17, 2023, regulating the life cycle of batteries from production to recycling. From 2025, rechargeable industrial batteries above 2 kWh, electric vehicle batteries, and light motor vehicle batteries must have a CO2 footprint declaration. From 2027, they must have a digital battery passport.
If you work with multiple locations or multiple suppliers, it is advantageous to ensure consistent documentation across the board so that compliance does not become an afterthought. This facilitates both internal approval and dialogue with the installer and network company.
The installation process for solar cells typically follows three main phases: planning and preparation, installation, and inspection and commissioning. The total time frame from initial consultation to final inspection is typically 1–3 months.
To keep the schedule realistic, it is advantageous to clarify interfaces early on: who delivers what, what documents are required for grid connection, and when the various trades (roofing, electrical, any building inspection) are to be carried out. This reduces the risk of waiting time because a sub-task is missing when the fitters are on site.
After commissioning, it is valuable to follow up on whether the system is performing as expected during the first weeks of operation. This is typically when minor adjustments to the inverter and battery management can be fine-tuned so that energy storage and solar cells work according to the strategy you have established for economy and operation.
There are several factors that can affect both operation and yield. A robust solution is rarely about one choice, but about getting the whole picture to fit together: components, dimensioning, installation, and documentation.
Use the list as a concrete decision-making tool: Which risks can you document with data and component selection, and which risks require operational agreements, e.g., how the battery may be loaded and what limits are set in the control system.
For you, risk management is primarily about correct dimensioning, documentable component selection, good installation quality, and a process where grid requirements and documentation are considered from the outset. When energy storage and solar cells are planned together, it also becomes easier to establish clear responsibilities and a solution that can be operated stably over time.
Do you have questions or need advice? Our experts are ready to help you.
If you would like to contact support, please call +45 35 153 123 or send an email to support@xolta.com.