Storing electricity from solar cells involves saving surplus electricity from your solar cell system so that it can be used later. This is typically done in a solar battery, which is charged when production exceeds consumption and discharged when you need power – especially in the evening, at night, or on cloudy days. The point is to balance out the difference between when the power is produced and when it is used.
In practice, storing electricity from solar cells can give private individuals a higher level of self-consumption of solar production, while businesses and public sector players often use storage to increase security of supply and create more flexibility in energy consumption. Whether the case is a detached house, a housing association, or a manufacturing company, a good solution starts with clarifying what consumption patterns the battery should support and how it should interact with existing installations.
Storing electricity from solar cells is a method whereby surplus production from solar cells is stored for later use – typically in solar cell batteries (PV batteries). The battery is charged when the solar cells produce more than is consumed, and discharged when consumption exceeds production. This makes the energy flow more predictable because you can use your own electricity to a greater extent when the need arises.
The aim is to address the mismatch between production and consumption. For private individuals, it can increase self-sufficiency and provide backup in the event of power outages. For businesses, it can strengthen security of supply and energy flexibility. At the same time, it is important to view the solution as an interaction between components: solar cells, inverter/control, battery, and electrical installation. When they work together, storage becomes not just "a battery," but a plan for when energy should be stored and when it should be used.
Batteries are the most widely used technology for storing electricity from solar cells. They can be installed in many sizes – from smaller buildings to larger facilities. Modern solar cell batteries are characterized by, among other things, high energy density, i.e., the ability to store a large amount of energy in relation to their size.
For you, this means that the battery solution can be adapted to both space constraints and needs – but that dimensioning and integration must be properly thought out from the outset. A battery that is "big enough" can still provide a poor experience if its power (kW) does not match the load profile, or if the control system does not take into account when you actually need power. Conversely, a smaller battery may be relevant if the primary purpose is to transfer solar energy from day to night and if the installation is easy to integrate with the existing inverter and electrical panel.
In hybrid systems, where there is both solar production and battery storage, a hybrid inverter is often used. It controls both functions in one unit. This can increase the self-consumption rate to up to 80% compared to approximately 20% with conventional solar inverters.
Trade-off: Hybrid inverters are both more expensive and more complex than simple solar inverters. This places higher demands on correct design and commissioning. In practice, you should therefore ensure that the interfaces are clear: Who is responsible for setup, testing, and documentation, and how is it verified that the battery charges and discharges as expected in the situations that matter to you (e.g., evening consumption, peak loads, or specific operating periods)?
The choice of battery solution should be based on specific requirements and usage patterns – not standard packages. Good dimensioning typically starts with getting an overview of when you have a surplus from the solar cells and when you have a deficit. You can then assess what capacity and power makes sense and whether there are any special operating requirements for integration and control.
Dimensioning should be based on:
When applying these points in practice, a simple rule of thumb is to ask yourself two questions: "How much power will we be able to transfer from day to night?" (capacity) and "What loads must the battery be able to handle?" (power). If the battery can store a lot but cannot deliver quickly enough, it may feel as if the capacity is "unusable." Conversely, high power without sufficient capacity can result in a solution that only helps in the short term.
Important: Battery charge and discharge cycles must be carefully managed to maintain battery health. This is a key focus area in the design and operation of the solution. It is not only about avoiding unnecessary cycles, but also about defining an operation that suits your purpose: Should the battery primarily balance day/evening, support operation during outages, or create flexibility during specific periods? Clarifying this makes it easier to choose the correct control strategy from the outset.
Regulations and frameworks can be a practical challenge, especially for private individuals. It has been stated that there are no clear regulations for private battery systems in Denmark, which makes early clarification and correct documentation particularly important. In practice, this means that you should set aside time for dialogue about the location, size, and documentation requirements of the installation before ordering equipment or agreeing on final installation.
When assessing size and location, it is important to consider both safety and regulatory requirements at an early stage so that the project does not come to a halt at a late stage. The specified frameworks are typically as follows:
It is advantageous to clarify the location early on, as it can affect cable routing, access to service, and the practical possibilities for expansion later on.
Documentation is often what makes the difference between a smooth process and a process involving repeated clarifications. If the unit contains electrical energy storage, technical documentation (Appendix B1.2 from Energinet's Technical Regulation 3.3.1) and a CE declaration of conformity must be completed. Ensure that the documentation is complete and unambiguous so that all parties work from the same basis during commissioning and subsequent operation.
A structured regulatory process with clear documentation and early clarification reduces the risk of delays and additional costs. Unstructured processes can lead to redesign and delays, which are often more expensive to rectify late in the project.
It typically helps to work in a clear sequence: first clarify requirements and prerequisites, then lock in the technical solution, and finally carry out installation and testing. When the documentation follows the same logic, it becomes easier to answer questions along the way and to document that the solution has been installed as planned.
Installation and implementation require a practical process in which technology and regulatory requirements go hand in hand. A typical process includes:
To make the process more robust, it is a good idea to define what constitutes "ready for the next step" at each point. For example: A completed needs assessment means that capacity, power, and location have been decided, and that integration with existing installations has been described. This makes commissioning more predictable because there is a common expectation of what needs to be tested and approved.
For solar parks, battery installation typically requires only about 1% extra space. This means that batteries can often be integrated relatively easily into existing areas when considered in the layout and logistics from the outset. In practice, you should still take into account access conditions, service areas, and a location that suits cabling and operating routines so that daily operations are not more cumbersome than necessary.
Batteries are considered the most advanced technology for the time intervals relevant to solar cells. However, there are other storage technologies that may be relevant depending on your needs. These alternatives are particularly useful if your energy needs are primarily related to heating or cooling, or if you work with larger, central energy systems.
For many, battery storage will still be the most direct solution for transferring solar energy from daytime to evening hours. The alternatives may be relevant if the energy demand is primarily for heating/cooling, or if you want to store energy in a way that is better suited to a specific process. The most important thing is to choose the form of storage based on the type of energy you need and when the need arises.
Do you have questions or need advice? Our experts are ready to help you.
If you would like to contact support, please call +45 35 153 123 or send an email to support@xolta.com.