Load shifting in industry involves shifting electricity consumption from hours with high demand and typically higher prices to hours with lower demand – without changing the total annual energy consumption. This is particularly relevant for Danish industrial companies because spot prices on Nord Pool vary significantly throughout the day and because the grid is increasingly affected by variable wind and solar production. With the right data, a realistic assessment of your processes, and robust management, load shifting in industry can become a concrete operating strategy that both supports your finances and gives you more predictable energy operations in a daily environment with changing price and grid signals.
Load shifting: A load management method where you shift electricity consumption from peak hours to off-peak hours without changing your total annual energy consumption. This could involve, for example, scheduling energy-intensive processes when electricity prices are lower or when there is a surplus of renewable energy in the system. In practice, this involves identifying the parts of your operations that can be shifted in time and doing so in a way that does not affect deliveries, quality, or safety.
Peak shaving: Often used in the same context, but not the same thing. Peak shaving is about reducing peak loads (peaks) to avoid high demand-related grid fees. Load shifting moves consumption; peak shaving reduces peaks. However, many companies end up working with both because shifting consumption can often also affect the highest measurement points in the period.
Load leveling: Aims to even out demand over time to stabilize the grid. Load shifting in industry is more directly linked to price and grid signals and to the rescheduling of controllable loads within the limits that your operations can accept.
Load shifting in industry is well suited to Danish conditions because the electricity market is liberalized and based on an hourly price signal. Spot prices from Nord Pool are published the day before at 2 p.m., which allows you to plan operations based on known price profiles with 12–36 hours' notice. This does not mean that everything can or should be shifted, but it provides a stable basis for decision-making when planning processes that already have built-in time windows.
At the same time, the digital infrastructure supports detailed measurement values, including 15-minute billing. This provides a stronger data basis for identifying peak loads and assessing what can actually be shifted. The more accurately you can see the connection between production activity and electricity consumption, the easier it is to separate "must-run" consumption from flexible consumption and make load shifting in industry a controlled operational discipline rather than an ad hoc exercise.
The primary economic motivation for load shifting in industry is to reduce overall energy costs by taking advantage of hourly price differences and dynamic tariffs. To realistically assess the potential, you should combine three things: your current consumption profile, your billing model, and your practical flexibility in production.
The typical economic drivers can be summarized as follows:
Important for the decision: The effect depends on how much of your consumption can actually be shifted. If only a small portion is flexible, the gain will be correspondingly limited – even if the price differences are large. A practical approach is to distinguish between "transferable consumption" and "sensitive consumption": some things can be transferred without consequence, while others can only be transferred if you accept extra complexity in planning, staffing, or maintenance.
Load shifting in industry requires structured implementation, where technology and operating practices work together. The goal is not to make operations unnecessarily complicated, but to introduce a few clear management rules that can be followed every day and documented in your data.
A robust implementation can be built up in three steps, where you continuously limit risk and learn from the results.
Start by collecting and analyzing detailed consumption data, preferably from both the main meter and any submeters. The purpose is to understand when and where consumption occurs, identify peaks, and assess your tariff and grid fee profile. In practice, you should look for recurring patterns in particular: fixed start-up peaks, simultaneity between equipment, and periods when consumption increases without production necessarily doing so.
Make the analysis action-oriented by linking consumption peaks to specific events in operations (e.g., start-up, shift change, cleaning, or batch change). When you can explain peaks with operations, you can also change them with operations. This is often the quickest way to determine whether load shifting in industry is a planning issue, a control issue, or both.
Load shifting in industry works best when you have consumption that can be shifted in time without changing energy requirements. This requires clear guidelines for what can be shifted, for how long, and with what operational requirements (production, quality, deliveries). A practical way to do this is to describe each potential load with three simple parameters: how much it typically uses, how quickly it can be started/stopped, and what time window it can be in without affecting output.
It also helps to clarify what "flexibility" means to you: Is it being able to move the start time? Being able to drive slower or faster? Or being able to take a short break? Even small time windows can be relevant if they fall within the hours when price and tariff differences are greatest, or when your peaks typically occur.
There are typically three levels of control. The choice is not only about technology, but also about how much variation your operations can handle and how clearly you can define the rules for what is "permitted" to move.
Regardless of the level, load shifting in industry is most sustainable when decisions can be explained afterwards: Which rule or plan shifted the load, and what was the result in terms of consumption, peaks, and operation?
Several technologies can increase the value and robustness of load shifting in industry because they give you more options without disrupting production unnecessarily. What they have in common is that they can create a "buffer" between market signals and physical production, making flexibility more controllable.
A battery storage system can be charged during off-peak hours and used during peak hours. This makes it possible to decouple when you buy electricity from when you use it – and can thus increase the value of load shifting in industry, especially when price differences are significant. In operational practice, this means that you can plan battery charging and discharging as a separate "energy store" that can relieve your most critical hours without necessarily changing the production plan itself.
To use the battery in a disciplined manner, you should have clear guidelines for when the battery should prioritize price and when it should instead prioritize supporting operations (e.g., avoiding peaks). It is precisely in these priorities that load shifting in industry becomes a management task and not just a question of hardware.
Power-to-heat converts electricity into heat for processes such as drying or space heating. With thermal storage, the heat can be stored temporarily, allowing electricity consumption to be shifted to times when prices are lower or renewable energy production is high. The solution can also be implemented in parallel with conventional heat production, which can make the phase-in more flexible. In practice, this can give you a controllable load where you can "produce heat in advance" as long as temperature and process requirements are met.
The key is to define which temperature limits and comfort/process requirements must not be exceeded. Once the limits are clear, you can shift electricity consumption more safely and make load shifting in industry a predictable part of heating and process control.
Load shifting in industry is an operational strategy—not a "free" gain. Therefore, you should assess risks early on and describe how they are handled in your management setup so that flexibility does not create unforeseen costs or operational problems.
The most common trade-offs typically look like this:
A robust approach is to start conservatively with clearly defined flexibility and expand gradually as data and operations show that it can be done stably. This gives you a controlled learning curve, where load shifting in industry evolves from pilot behavior to a fixed operating routine.
Do you have questions or need advice? Our experts are ready to help you.
If you would like to contact support, please call +45 35 153 123 or send an email to support@xolta.com.