Load shifting is a method of shifting electricity consumption from hours with high load and typically higher electricity prices to hours with lower load and often lower electricity prices – without changing the total electricity consumption. This makes load shifting relevant for both businesses and private individuals, because you can adapt your consumption to the price and load patterns of the electricity market. In Denmark, these opportunities are supported by hourly spot prices and a market infrastructure that handles detailed measurement data. With the right management, load shifting can become a practical part of energy management without compromising operations, comfort, or quality.
Load shifting means shifting the timing of electricity consumption from peak load periods to low load periods. Important: Total energy consumption remains the same – it is the timing that changes. It is therefore a management task: You decide which loads can be shifted, how far they can be shifted, and which requirements must never be compromised.
It is essential to distinguish load shifting from related strategies so that you do not evaluate a project on the wrong basis:
When working with load shifting, it makes sense to define what counts as "success": Is it primarily lower costs by exploiting price variations, or is it avoiding unwanted downtime and keeping the load more stable? This clarification makes it easier to choose the form of control and prioritization.
Electricity prices in the market vary according to supply and demand. When overall demand increases, prices typically rise – and vice versa. This creates an economic incentive for load shifting if you can move flexible consumption to cheaper hours. In practice, this means that timing becomes an active part of your energy management, not just something that "happens" in the background.
In Denmark, there is a practical prerequisite: Spot prices from Nord Pool are published daily as day-ahead prices, which makes it possible to plan consumption based on known prices for the next 24 hours. This gives you a concrete basis for decision-making: Which loads can be moved tomorrow, and which must run regardless of price? For many, it is crucial to work with clear "stop rules" so that consumption is not shifted if it compromises operations, comfort, or quality requirements. Stop rules can, for example, describe limits for temperature, production rate, or deadlines, so that load shifting always stays within what is acceptable in your everyday life.
Peak demand typically occurs during specific time windows when many users consume electricity simultaneously. Off-peak hours are characterized by lower overall demand. Load shifting is about taking advantage of these patterns, but it makes particular sense when you have both consumption that can be shifted and a billing system that clearly rewards good timing.
For companies, the economic driver can typically come from two directions, which should often be assessed separately:
In practice, it can help to map out your daily profile: When are the biggest stresses, and what triggers them? Once you know the typical "coincidences," it becomes easier to decide which stresses can be deprioritized, postponed, or distributed.
Load shifting can be implemented in several ways depending on your flexibility and technical setup. Overall, it is about identifying "movable" loads and managing them according to price and load signals. A practical starting point is to keep decisions simple: What can be moved, how much, for how long – and what must never be moved?
To make the work operational, you can typically think in three steps: (1) identify loads with flexibility, (2) establish frameworks and stop rules, and (3) choose a management method that suits your operations. In this way, load shifting becomes not a one-off exercise, but a repeatable routine.
In the simplest form, you plan for selected activities to be carried out during low-cost/low-load periods. For private individuals, these may be obvious, flexible activities that can be postponed. For companies, these may be selected processes if operations can be adapted. The key is to choose activities where a changed start time does not create follow-up problems further down the process.
If you start manually, it is often most robust to work with a few clear rules rather than many exceptions. This could involve, for example, grouping movable tasks into specific time slots while ensuring that someone is responsible for following up if plans change. Once the routine is working, it becomes easier to expand with more workloads or more detailed planning.
Many commercial and industrial environments use dynamic load management systems that can automatically adjust loads based on price and/or grid data—within defined operating parameters. This is often where load shifting becomes scalable in everyday life, because it reduces the need for ongoing manual monitoring. Automation can also make it easier to adhere to stop rules, because the control system can respond consistently, even when the operating conditions change.
In order for automated load shifting to be helpful rather than a hindrance, the framework must be specific: What loads can the control system adjust, what limits apply, and how are deviations handled? It may also be advantageous to define what should happen in case of uncertainty: Should the system choose a conservative strategy, or should it utilize flexibility more actively if the framework is adhered to?
Battery Energy Storage Systems (BESS) can enable load shifting even when you cannot move production or activities. The battery can be charged during off-peak hours and supply energy during peak hours, effectively decoupling the time of consumption from the time of payment. This can be a way to achieve load shifting without changing operations and staffing, which can otherwise have significant consequences.
From an operational and planning perspective, the advantage is that you can maintain your process rhythm and still work according to price and load signals. It also changes the task from "can we move the work?" to "when should the battery be charged and discharged within safe limits?". This requires clear priorities for when the battery should be used for load shifting and when it should not be used if it conflicts with other operational needs.
Heat pumps can contribute to load shifting because heat can be temporarily "stored" in the building (thermal mass) without necessarily exceeding comfort limits. In Danish trials, heat pump consumption has been controlled so that planned load reductions could be delivered without exceeding comfort requirements. At the same time, it has been documented that event duration and setpoint changes are crucial to how much flexibility can be activated without causing discomfort.
In practical terms, this involves working with small, controlled adjustments, where comfort remains the top priority. If a load shifting event lasts too long, or if the set point is moved too much, it can be perceived as annoying or create unwanted "overshoot," where the system later needs to use extra energy to return to the desired level. Therefore, it is typically advantageous to test flexibility in short intervals and use the experience to determine which settings work best in your particular building.
The economic impact of load shifting depends primarily on how clear the price signals are and how much of your consumption can realistically be shifted without creating new costs elsewhere. It is therefore important to assess both the potential and the practical consequences before committing to a model.
The most important factors to consider in the assessment are:
Research has shown potential cost savings of up to 34% and emission reductions of up to 19% with the correct application of load shifting. At the same time, it is important to note that the effect may vary with price profiles and changes in the production mix over time. Therefore, it often makes the most sense to work with a solution where the framework can be adjusted when operating requirements or price signals change.
There is a difference between what can theoretically be moved and what can actually be moved in practice. Limitations often relate to time, process requirements, and behavior. The most robust approach is to make the limitations explicit before you start moving loads, so that you avoid creating hidden problems in operation or comfort.
Here are the typical obstacles and what they mean for your planning:
Regardless of whether you work manually or automatically, it helps to document your stop rules and keep them stable for a period of time. When you can see that operation and quality are not affected, it becomes much easier to extend load shifting to more loads or work more finely with the control system.