Emergency power for businesses

Emergency power for businesses is about ensuring your most critical functions continue to operate when the power grid fails. For many businesses, even short interruptions can result in production losses, data failure, or security issues. With the right solution, power can be taken over automatically and keep selected loads running until normal supply is restored. Here you will find a practical overview of technologies, requirements, processes, and typical pitfalls, so you can make a decision based on solid information.

What does emergency power mean for your daily business operations?

Emergency power for businesses is a temporary power supply that takes over in the event of a power outage. The solution is typically a diesel or gas generator, a battery bank, or a UPS(Uninterruptible Power Supply) system. The purpose is rarely to keep the entire business fully operational. In practice, it is a matter of identifying the functions where downtime is not acceptable and ensuring that they continue to operate stably, while the rest may be shut down in a controlled manner.

A distinction is often made between the following types of solutions. The choice depends mainly on whether the need is permanent and how quickly you need to be able to respond in the event of an outage:

  • Stationary solutions: Permanently installed systems, dimensioned for a specific site and integrated into the installation. This makes them suitable when emergency power is part of your regular contingency plan.
  • Mobile solutions: Flexible solutions for situations where the need is not permanent. They are typically used when you can accept a more manual approach and where the operating situation varies.

Emergency power for businesses: Typical needs across industries

The need for emergency power for businesses depends on how critical your operations are and how quickly an outage affects production, safety, and IT. When making this assessment, it is helpful to distinguish between: what must continue to run, what can be shut down in a controlled manner, and what can be without power for a period of time.

Several sectors are particularly vulnerable:

  • Industry and manufacturing: Complex, electronically controlled processes can take time and resources to restart, and errors can lead to scrapping and recalibration. Emergency power can therefore focus on process-critical parts, controls, and safety systems rather than the entire factory.
  • Agriculture: Ventilation, feeding systems, milking systems, and cooling systems make operations dependent on a stable power supply. Here, prioritizing loads can be crucial so that the most essential functions always have power.
  • Medical areas: Special provisions apply to electrical installations and generators, which must be agreed with the relevant health organization/staff. This means that requirements and approvals should be clarified early in the process so that the solution can be implemented correctly.
  • Data centers and telecom: Even very short interruptions can be business-critical, and facilities are often designed to continuously secure critical functions. Here, transition time and power quality are often just as important as the duration itself.

Denmark generally has a high level of supply reliability, but outages still occur. In 2021, the average customer experienced 21.8 minutes of outages. For you, even a few minutes of downtime can be enough to cause operational losses if critical systems are not protected.

Emergency power for businesses: Choosing technology that matches response time and duration

There are three main considerations when choosing emergency power for commercial use. The choice is mainly about response time (how quickly the power must be restored), duration (how long you need to be able to run), and which loads are critical. A practical way to approach this is to start with your requirements: How quickly must the power be restored before operations or safety are affected? And how long must the selected functions be able to continue operating in the event of a prolonged outage?

Generator (diesel or gas) as a solution for emergency power for businesses

Emergency generators are widely used because they can deliver high power and run for long periods of time as long as there is fuel. They are often used when you need high capacity or when backup must be maintained over a longer period of time. However, they typically have requirements in terms of space, noise, service, and fuel preparedness.

Dimensioning should be based on the total power consumption of the units to be backed up, and start-up current must be taken into account. For motor-based equipment, start-up current can typically be 2 to 3 times the normal operating power. In practice, this means that a system that looks "right" on paper can still fail at start-up if starting currents or simultaneity have not been assessed.

Also consider how the generator should be activated in the event of a power failure: Should it start automatically, and should it only supply selected circuits? This is often where you can avoid both oversizing and unnecessarily complicated installation.

UPS and battery-based emergency power for businesses

UPS systems supply power from batteries and can ensure a very fast transition in the event of a power failure. This makes them relevant when your equipment cannot tolerate interruptions or when you want a controlled transition that protects data and electronics. Battery-based emergency power is typically used to "bridge" an outage so that critical systems can either continue to operate or a controlled shutdown can be achieved.

There are three main types. The difference mainly concerns how they handle transitions, voltage variations, and power quality:

  • Standby UPS: Switches to battery power in approx. 20-100 milliseconds.
  • Line-Interactive UPS: Has a transformer that better handles power dips.
  • Online UPS: Provides constant power from its own reserves and offers full protection against power problems.

UPS solutions typically have lower running costs than generators, but batteries have a limited lifespan and are usually replaced after 3-5 years, depending on the type and operating pattern. To get a solution that really meets your expectations, you should clearly define what the UPS should provide: How long should it be able to supply power, and which systems should be covered? This makes it easier to plan capacity, testing, and replacements.

Hybrid emergency power for businesses: Battery combined with generator or solar cells

Hybrid solutions combine technologies to achieve rapid takeover and longer operation. The battery can stabilize and handle rapid changes, while the generator can supply energy over a longer period of time when the battery would otherwise be depleted. This can be an advantage when you have both sensitive loads that require a quick and stable transition and a need for backup that can be kept running for longer periods of time.

To function robustly, it requires well-thought-out interaction: which circuits are battery-powered, when the generator should start, and how switching is handled without unwanted interruptions or loads. A practical rule of thumb in project work is to describe operating modes: normal operation, grid failure, transition to backup, and reconnection to the grid. When these modes are clear, control and switching requirements become much easier to translate into a stable solution.

Emergency power for businesses: Automatic transfer switching (ATS) and island operation in practice

Automatic switching is key to emergency power for businesses when downtime needs to be minimized without manual intervention. An ATS (Automatic Transfer Switch) monitors the supply and automatically switches to backup in the event of a failure. This reduces the need for someone to be present and makes emergency power an integral part of contingency planning rather than a "plan B" that requires manual handling.

When planning, you should also consider what should happen when the mains power returns: Should the switchback be automatic, and how can a stable reconnection without disruptions be ensured? Clarifying this will make it easier to test the solution and ensure that the switchback works in the order required by your operations.

Special conditions apply to solar cell battery systems if island operation (operation without the electricity grid) is desired. When solar cells are backed up by batteries, the system must use a hybrid inverter. If you want to be able to run in island mode, you will need a control box called Transfer Switching Equipment (TSE). In practice, you should clarify early on whether the need is actually for island operation or whether the goal is primarily short-term backup for selected circuits, as this affects both design and integration.

Emergency power for businesses: Regulations, grid connection, and environmental considerations

Emergency power for businesses is covered by both EU requirements and Danish regulations for safe installation, working environment, and emergency preparedness. EU Regulation 2016/631 (RfG – Requirements for Generators) affects how production facilities may be connected to the power grid. In practice, this means that technical choices and operating modes (e.g., parallel operation) can trigger different requirements, which should be part of the project clarification before you commit to a specific solution.

If a backup system runs in parallel with the grid for less than five minutes per month, it must comply with a limited number of requirements. If parallel operation is expected for more than five minutes per month, the system is treated as a normal production facility and must meet all relevant requirements. It is therefore important that your expected operating scenarios are described correctly so that the system is neither under- nor over-regulated in the design phase.

The following areas are common to many projects and should be clarified so that your solution can be approved and operated responsibly:

  • Grid connection: The process begins by contacting the relevant grid operator, and the process may vary between grid operators. Ensure that you have a clear description of the plant, its capacity, and how it operates, as this typically facilitates the dialogue.
  • Installation safety: The system must be designed so that a prospective touch voltage of more than 50 V cannot be maintained. This places demands on installation, protection, and documentation.
  • Environmental approval and noise: Diesel and gas generators may require environmental approval depending on their power and operating time. In commercial and industrial areas, there are recommended noise limits of 70 dB. Consider the location and any noise reduction measures early on so that this does not become an obstacle later in the process.

There are positive lists of approved inverters and batteries to support smooth case processing for grid connection of solar cell battery systems; these have so far been applicable to systems up to 125 kW, with an expectation that the limit will be raised to 1 MW. If you are working with solar cell batteries in an emergency power context, it may therefore be advantageous to ensure that your choice of components and documentation match the expectations that typically apply in the case processing.

Emergency power for businesses: How to implement your project from risk analysis to operation

A robust emergency power project starts with a structured approach. This reduces the risk of costly mistakes and ensures that the solution and organization work together. A key point is that emergency power is not just about hardware: it is also about priorities, procedures, testing, and responsibility for operation.

The following steps can be used as a practical checklist during the process. Once these points have been clarified, it will be easier to dimension correctly and ensure a solution that works in real-life conditions:

  • Risk and vulnerability assessment: Create a shared understanding of what needs to be secured and why. Involve operations, IT, production, and management. Also agree on which incidents you will measure and what constitutes an "acceptable" residual risk.
  • Load prioritization: Make a list of critical loads and choose what really needs to be on emergency power. This is often where you achieve the greatest effect: ensuring the right circuits rather than as many as possible.
  • Dimensioning: Calculate power requirements and take into account the starting current of motor-based equipment. At the same time, consider whether loads start simultaneously in the event of a power failure, or whether they can be sequenced to reduce peak loads.
  • Integration: Coordinate with IT and building functions to ensure that central systems do not fail in the event of an outage. Clarify dependencies on networks, access control, monitoring, and control, for example, so that critical functions do not stop due to "side systems."
  • Maintenance and preparedness: Ongoing maintenance, documentation, and updated procedures are essential to ensure that the solution works when needed. Also, plan how you will test it and who will be responsible for follow-up so that preparedness does not become dependent on specific individuals.

Once the project has been implemented, you should be able to answer three questions clearly: What is secured, how long is it secured for, and how do we know that it works? It is often this clarity that makes emergency power a real operational safeguard rather than an untested installation.

Emergency power for businesses: Economics, downtime costs, and pitfalls to avoid

The economics of emergency power for businesses should be assessed as an overall economic assessment over the lifetime: investment, expected operating time per year, service, and the consequences of a lack of emergency power. Stationary solutions for larger industrial needs can cost hundreds of thousands of dollars, depending on capacity and installation complexity. Therefore, it makes sense to weigh the economics against specific risks: What does an outage cost in terms of operation, quality, deliveries, safety, and any restart processes?

The costs of power failures can be significant. For a four-hour outage, the cost is estimated at DKK 136 per kWh for industrial companies and up to DKK 276 per kWh for service companies. A food manufacturer has estimated lost working time at DKK 300,000 per hour. In practice, it is helpful to use such key figures to prioritize which parts of the operation should be on emergency power and how robust the solution should be.

Typical pitfalls often arise at the interfaces between electricity, operations, and IT. Here are the most common ones and how you can deal with them in your project:

  • Under- or oversizing: Too small a system provides insufficient backup; too large a system incurs unnecessary costs. Clear load prioritization and realistic operating scenarios are typically the best antidote.
  • Lack of maintenance: Generators require regular inspection, fuel management, and test runs; UPS batteries must be replaced periodically. Without a fixed plan, you risk a decline in capacity and reliability over time.
  • Inadequate IT integration: Power failures can affect access, doors, data collection, and control if the solution is not coordinated with IT. Clarify dependencies on networks and control systems so that critical functions do not stop even if the power supply is secured.
  • Power quality: Voltage dips and variations can affect equipment even without complete failure; an analysis of power quality can reveal the need for filtering. This can be crucial for sensitive electronics, even when the overall delivery time looks "fine."
  • False sense of security: Without proper documentation, testing, and commissioning, errors are often only discovered during actual operation. Therefore, plan how you will test switching, load, and feedback so that the solution can be verified in practice.

FAQ about emergency power for businesses

  • What is emergency power for businesses? Temporary power supply that takes over in the event of a power outage via, for example, a generator, battery bank, or UPS, so that selected critical functions can continue to operate.
  • Which solution is fastest in the event of a power failure? UPS solutions can switch to battery operation in milliseconds (e.g., 20-100 ms for standby UPS), which is relevant for sensitive electronics.
  • What is an ATS, and why is it important? An ATS (Automatic Transfer Switch) monitors the power grid and automatically switches to backup power, minimizing downtime without manual intervention.
  • When do special requirements apply if the system runs in parallel with the electricity grid? If the backup system runs in parallel with the electricity grid for more than five minutes per month, it is treated as a normal production system and must comply with all relevant requirements.
  • What should we be aware of when dimensioning? You should calculate the total power requirement for critical loads and take into account the starting current, which for motor-based equipment can typically be 2-3 times the operating power.
  • What maintenance requirements are typical? Generators require regular maintenance, fuel checks, and test runs. UPS batteries have a limited lifespan and are typically replaced after 3-5 years, depending on the type and operation.

Contact us

Do you have questions or need advice? Our experts are ready to help you.

Contact support

If you would like to contact support, please call +45 35 153 123 or send an email to support@xolta.com.

Contact sales