Emergency power for businesses is about ensuring your most critical functions continue to operate when the power grid fails. For many businesses, even short interruptions can result in production losses, data failure, or security issues. With the right solution, power can be taken over automatically and keep selected loads running until normal supply is restored. Here you will find a practical overview of technologies, requirements, processes, and typical pitfalls, so you can make a decision based on solid information.
Emergency power for businesses is a temporary power supply that takes over in the event of a power outage. The solution is typically a diesel or gas generator, a battery bank, or a UPS(Uninterruptible Power Supply) system. The purpose is rarely to keep the entire business fully operational. In practice, it is a matter of identifying the functions where downtime is not acceptable and ensuring that they continue to operate stably, while the rest may be shut down in a controlled manner.
A distinction is often made between the following types of solutions. The choice depends mainly on whether the need is permanent and how quickly you need to be able to respond in the event of an outage:
The need for emergency power for businesses depends on how critical your operations are and how quickly an outage affects production, safety, and IT. When making this assessment, it is helpful to distinguish between: what must continue to run, what can be shut down in a controlled manner, and what can be without power for a period of time.
Several sectors are particularly vulnerable:
Denmark generally has a high level of supply reliability, but outages still occur. In 2021, the average customer experienced 21.8 minutes of outages. For you, even a few minutes of downtime can be enough to cause operational losses if critical systems are not protected.
There are three main considerations when choosing emergency power for commercial use. The choice is mainly about response time (how quickly the power must be restored), duration (how long you need to be able to run), and which loads are critical. A practical way to approach this is to start with your requirements: How quickly must the power be restored before operations or safety are affected? And how long must the selected functions be able to continue operating in the event of a prolonged outage?
Emergency generators are widely used because they can deliver high power and run for long periods of time as long as there is fuel. They are often used when you need high capacity or when backup must be maintained over a longer period of time. However, they typically have requirements in terms of space, noise, service, and fuel preparedness.
Dimensioning should be based on the total power consumption of the units to be backed up, and start-up current must be taken into account. For motor-based equipment, start-up current can typically be 2 to 3 times the normal operating power. In practice, this means that a system that looks "right" on paper can still fail at start-up if starting currents or simultaneity have not been assessed.
Also consider how the generator should be activated in the event of a power failure: Should it start automatically, and should it only supply selected circuits? This is often where you can avoid both oversizing and unnecessarily complicated installation.
UPS systems supply power from batteries and can ensure a very fast transition in the event of a power failure. This makes them relevant when your equipment cannot tolerate interruptions or when you want a controlled transition that protects data and electronics. Battery-based emergency power is typically used to "bridge" an outage so that critical systems can either continue to operate or a controlled shutdown can be achieved.
There are three main types. The difference mainly concerns how they handle transitions, voltage variations, and power quality:
UPS solutions typically have lower running costs than generators, but batteries have a limited lifespan and are usually replaced after 3-5 years, depending on the type and operating pattern. To get a solution that really meets your expectations, you should clearly define what the UPS should provide: How long should it be able to supply power, and which systems should be covered? This makes it easier to plan capacity, testing, and replacements.
Hybrid solutions combine technologies to achieve rapid takeover and longer operation. The battery can stabilize and handle rapid changes, while the generator can supply energy over a longer period of time when the battery would otherwise be depleted. This can be an advantage when you have both sensitive loads that require a quick and stable transition and a need for backup that can be kept running for longer periods of time.
To function robustly, it requires well-thought-out interaction: which circuits are battery-powered, when the generator should start, and how switching is handled without unwanted interruptions or loads. A practical rule of thumb in project work is to describe operating modes: normal operation, grid failure, transition to backup, and reconnection to the grid. When these modes are clear, control and switching requirements become much easier to translate into a stable solution.
Automatic switching is key to emergency power for businesses when downtime needs to be minimized without manual intervention. An ATS (Automatic Transfer Switch) monitors the supply and automatically switches to backup in the event of a failure. This reduces the need for someone to be present and makes emergency power an integral part of contingency planning rather than a "plan B" that requires manual handling.
When planning, you should also consider what should happen when the mains power returns: Should the switchback be automatic, and how can a stable reconnection without disruptions be ensured? Clarifying this will make it easier to test the solution and ensure that the switchback works in the order required by your operations.
Special conditions apply to solar cell battery systems if island operation (operation without the electricity grid) is desired. When solar cells are backed up by batteries, the system must use a hybrid inverter. If you want to be able to run in island mode, you will need a control box called Transfer Switching Equipment (TSE). In practice, you should clarify early on whether the need is actually for island operation or whether the goal is primarily short-term backup for selected circuits, as this affects both design and integration.
Emergency power for businesses is covered by both EU requirements and Danish regulations for safe installation, working environment, and emergency preparedness. EU Regulation 2016/631 (RfG – Requirements for Generators) affects how production facilities may be connected to the power grid. In practice, this means that technical choices and operating modes (e.g., parallel operation) can trigger different requirements, which should be part of the project clarification before you commit to a specific solution.
If a backup system runs in parallel with the grid for less than five minutes per month, it must comply with a limited number of requirements. If parallel operation is expected for more than five minutes per month, the system is treated as a normal production facility and must meet all relevant requirements. It is therefore important that your expected operating scenarios are described correctly so that the system is neither under- nor over-regulated in the design phase.
The following areas are common to many projects and should be clarified so that your solution can be approved and operated responsibly:
There are positive lists of approved inverters and batteries to support smooth case processing for grid connection of solar cell battery systems; these have so far been applicable to systems up to 125 kW, with an expectation that the limit will be raised to 1 MW. If you are working with solar cell batteries in an emergency power context, it may therefore be advantageous to ensure that your choice of components and documentation match the expectations that typically apply in the case processing.
A robust emergency power project starts with a structured approach. This reduces the risk of costly mistakes and ensures that the solution and organization work together. A key point is that emergency power is not just about hardware: it is also about priorities, procedures, testing, and responsibility for operation.
The following steps can be used as a practical checklist during the process. Once these points have been clarified, it will be easier to dimension correctly and ensure a solution that works in real-life conditions:
Once the project has been implemented, you should be able to answer three questions clearly: What is secured, how long is it secured for, and how do we know that it works? It is often this clarity that makes emergency power a real operational safeguard rather than an untested installation.
The economics of emergency power for businesses should be assessed as an overall economic assessment over the lifetime: investment, expected operating time per year, service, and the consequences of a lack of emergency power. Stationary solutions for larger industrial needs can cost hundreds of thousands of dollars, depending on capacity and installation complexity. Therefore, it makes sense to weigh the economics against specific risks: What does an outage cost in terms of operation, quality, deliveries, safety, and any restart processes?
The costs of power failures can be significant. For a four-hour outage, the cost is estimated at DKK 136 per kWh for industrial companies and up to DKK 276 per kWh for service companies. A food manufacturer has estimated lost working time at DKK 300,000 per hour. In practice, it is helpful to use such key figures to prioritize which parts of the operation should be on emergency power and how robust the solution should be.
Typical pitfalls often arise at the interfaces between electricity, operations, and IT. Here are the most common ones and how you can deal with them in your project:
Do you have questions or need advice? Our experts are ready to help you.
If you would like to contact support, please call +45 35 153 123 or send an email to support@xolta.com.