Emergency power is a solution that ensures that selected or all electrical functions continue to operate when the public power grid fails. In Denmark, the security of supply is normally high, but interest in emergency power is growing in line with increased focus on preparedness, extreme weather, and the risk of technical or digital incidents. For both businesses and private individuals, it is a matter of choosing the right technology, having it installed safely, and testing it regularly. Here, we review what emergency power is, what solutions are available, and what you should clarify before investing, so you avoid a solution that only works "on paper."
Emergency power: An independent source of electrical energy that automatically or manually kicks in when the normal power supply is interrupted. The purpose is to keep critical loads running for a period after a failure. This can be anything from lighting and communications to pumps, IT, or access control, depending on requirements.
Backup power: Often used as a synonym, but can be understood more broadly. Backup power can cover longer-term operation and more extensive consumption, e.g., the entire house or a large part of the business. In practice, the difference can mainly be about how much needs to be kept running and for how long.
UPS (uninterruptible power supply): A specific type of solution that provides emergency power with very little or no interruption, while also filtering and regulating incoming power to ensure stability for sensitive equipment. This makes UPS relevant when even short interruptions can cause downtime, data loss, or equipment failure.
Power outages can occur for a number of reasons, including storms and other extreme weather, technical faults, and incidents such as buried cables. In addition, there are modern threats such as cyber attacks and sabotage against critical infrastructure. The consequences vary, but can be serious. When assessing your needs, it makes sense to start with what happens in your operations or everyday life if the power goes out for minutes, hours, or longer.
Common to both private and commercial users is that emergency power is often a trade-off between desired operational continuity and what is practical to establish and maintain. Therefore, you should clarify early on which functions are "critical" and which can be dispensed with during an outage.
There are several ways to obtain emergency power. The choice depends on how quickly you need power (transfer time), how long you need to be able to run (duration), and whether the solution should cover critical circuits or the entire building. It is often advantageous to think in terms of scenarios: What needs to continue immediately, and what can wait?
As a rule of thumb, UPS is relevant when the interruption must be minimal. A generator is relevant when duration is the most important factor. Batteries and solar cell systems may be relevant when you want an electrical solution that can deliver power to the property in the event of a power failure, provided that the system is designed for this purpose.
UPS: Provides power when the supply fails and can allow time for a controlled shutdown. Typically, internal batteries support 10–15 minutes of operation, and in some cases, more battery backup is needed. The practical point is that UPS is not just about "having power," but about protecting equipment and ensuring a controlled process so that data and components are not damaged.
When choosing UPS as your emergency power supply, you should consider what specifically needs to be protected (servers, networks, control systems, payment terminals) and whether the goal is to continue operations or simply to achieve a safe shutdown.
Regardless of the type, you should ensure that the UPS is dimensioned for the actual load and that the batteries' operating time matches your needs. A UPS that can only supply power for a few minutes may still be the right solution if it is intended as a bridge to a controlled shutdown or as a transition to another emergency power source.
Generators: Often used when power is needed for many hours or days, provided there is sufficient fuel. Modern emergency generators typically start in less than 10 seconds, but there will still be a start-up period. In practice, this means that a generator is rarely used on its own if you have equipment that cannot tolerate interruptions. Here, it is often combined with a solution that covers the "gap" during start-up.
Before choosing a generator as an emergency power source, you should clarify where the generator will be located, how fuel will be handled, and who will be responsible for operation and ongoing monitoring. Practical considerations often determine whether a solution will work in everyday life.
Safety: Generators require proper installation with a transfer switch/ATS to prevent backflow to the grid, which can be dangerous for electrical workers. It is also an important part of ensuring that the switch between grid and emergency power is controlled so that the installation is not exposed to inappropriate loads.
Solar cell battery systems: Can function as emergency power if the system is designed for off-grid operation (island operation), enabling it to produce and supply power independently of the grid in the event of a power failure – as long as the sun is shining and/or there is power in the battery. The key factor here is the design: A standard solar cell system cannot automatically supply power to the house in the event of a grid failure if it is not built for island operation.
Hybrid inverter and backup components: A hybrid inverter system can be combined with, for example, a backup box and automatic transfer switch (ATS) so that critical loads can be supplied when the grid fails. In practice, you should decide which circuits should have emergency power and how they should be separated from the rest so that the system is not overloaded during an outage.
Important restriction: The system may supply emergency power to the specific property, but it may not supply neighbors or an entire area in the event of a grid failure. This is a crucial clarification when planning the scope and connection.
Emergency power transfer (ATS): An automatic grid transfer switches from public supply to emergency power when an outage is detected. If automatic start-up is not possible, a manual switch is used. The big difference in practice is whether you can be present and take action when the outage occurs, or whether the solution must be able to function without staffing.
Load shedding: Non-essential loads can be automatically disconnected to ensure that the available emergency power is prioritized for critical systems. This reduces the risk of overload, which can cause the system to fail. For many, this is the key to a robust solution: you get power to the most important things, instead of trying to supply everything and risking losing it all.
A practical way to approach this is to define a "critical group" (e.g., communication, control, and necessary lighting) and a "comfort group" (e.g., other power outlets), so that you have agreed on the priorities in advance.
Electrical installations in Denmark are based on international and European standards (IEC 60364/HD 60364) and the Danish DS/HD 60364 series. In addition, technical requirements apply to electricity generation plants connected to the grid, and the requirements may vary depending on the expected operating time. For you, this means that requirements and documentation should be included early in the project so that the solution is both safe and legal to put into operation.
CE marking: For relevant components, CE marking is important, but it is not a quality mark. It indicates that the manufacturer declares compliance with relevant requirements. In practice, you should still ensure that the design, installation, and documentation of the solution are suitable for the application.
Private: Start by listing the appliances that need to be able to run during a power outage and note their power (W/kW) and phase/voltage (1-phase/230 V or 3-phase). Emergency power systems connected to the mains must be 3-phase. Many homes also have 3-phase consumers such as cookers or washing machines. Therefore, clarify whether the goal is to keep individual critical functions running or whether there is a need to cover multiple circuits.
Businesses: A targeted risk and vulnerability assessment should form the basis. Draw up a load prioritization list and clarify acceptable downtime before final dimensioning. Ensure that the list reflects actual operations: Which systems must not stop, and which can be restarted later without unacceptable consequences?
Pitfalls: Undersizing can mean that emergency power cannot deliver the necessary power. Oversizing can make the solution unnecessarily expensive in terms of investment and operation. Regardless of the technology, emergency power requires proper installation and ongoing maintenance to function when needed. A good decision point is therefore to assess both power requirements and duration together, so that you do not end up with high power for a short period of time when the actual need is for moderate power for a longer period (or vice versa).
Maintenance is crucial to ensuring that emergency power works in practice. A solution that is never tested can give a false sense of security. Therefore, plan regular routines for testing, logging, and follow-up so that errors are detected before a real incident occurs.
Regardless of the solution, you should ensure that those responsible for operations are familiar with the tests and services. You should also document what has been tested and what the results were so that you can monitor developments over time and respond if performance changes.