Reduction of peak power

Reducing peak power consumption involves reducing the highest simultaneous electricity load on the grid so that security of supply can be maintained – especially during periods of high consumption, such as cold winter days. For businesses, utilities, and housing providers, reducing peak power consumption can also mean limiting costs from capacity charges (power tariffs), where a single peak hour can have a significant impact on the bill. For private individuals, it may be a question of understanding what peak power means in practice and what technologies and control options can be used. Here we review definitions, methods, economic drivers, frameworks, and pitfalls—and how you can approach this in practice.

What does reducing the power peak mean in practice?

The peak load is the highest simultaneous electricity load in a given period, typically measured in kW at customer level or MW at system level.Peak shaving means that you control consumption so that the "maximum point" in the load profile is lower. So it's not just about using less electricity overall, but about avoiding many large loads hitting the same hour.

In practice, the work begins with defining the peak: On which days and at what times does it occur, how high is it, and which facilities drive it? Once you have that picture, you can choose whether to cover the peak (e.g., with batteries), shift it (e.g., with thermal storage), or avoid it (e.g., by planning operations differently). A robust solution also has clear rules for what can be controlled and what must never be compromised for the sake of operation, comfort, or process stability.

System considerations: When many consumers peak simultaneously, the need for grid capacity and production increases. In practice, it is expensive to dimension the electricity grid and production capacity for a few hours a year, which is why peak loads become a key planning problem.

Customer considerations: For many customers, the maximum power (kW) is directly linked to capacity charges/power tariffs. Therefore, reducing the power peak can be financially relevant, even if your total energy consumption (kWh) does not change significantly.

Why has reducing peak power consumption become a key challenge in Denmark?

The challenge is growing because new large electricity consumers are connecting to the grid, while peak loads typically occur during periods when the system is already under pressure. The electrification of heat supply with electric boilers and heat pumps, as well as growth in data centers, is increasing both the total power demand and the local load around selected hubs in the grid.

For you as a consumer or network operator, this means that "local peaks" can be just as crucial as the national situation. Even if there is enough energy overall throughout the day, there may be hours when local capacity is tight. It is precisely during these hours that reducing the power peak makes a difference – both technically and in terms of tariffs.

  • Electrified heating: Electric boilers are expected to reach a total of over 900 MW in Denmark and are mainly used for peak and reserve loads. Large heat pumps are expected to reach 1,500–2,000 MW of heating capacity in 2030, and the simultaneity of their operation can significantly affect the power peak. In practice, control, accumulation, and planning of operation can be decisive in determining whether electricity consumption is "smoothed out" or concentrated in a few peak hours.
  • Data centers: Electricity consumption in data centers is estimated at approximately 0.88 TWh (≈100 MW) in 2020 and is expected to rise to 4.8 TWh/year (≈550 MW) in 2030, with higher estimates of up to 8.76 TWh/year (≈1,300 MW). The load may be concentrated locally, thus creating local power peaks. This makes the interaction between load profile, grid connection, and flexibility (where possible) particularly important.

Reduction of peak power in relation to peak shaving and demand response

Reducing peak power is a specific strategy, while demand response is a broader concept. It is useful to distinguish between the two because your choice of goal will influence how you design your control system, measure power, and document results.

If your primary challenge is a power tariff or a technical limit in the connection, the focus is often on reducing a maximum (peak shaving). If your challenge is more about responding to prices or system requirements, this is typically referred to as demand response. In practice, however, the two can be combined so that you avoid the most expensive peak periods while complying with an internal power limit.

  • Peak shaving: Focuses specifically on reducing the peak itself – either by temporarily cutting consumption or covering it with a battery or local energy source. This requires that you know your "critical" loads and that you have a clear prioritization of what can be limited first.
  • Demand response (DSR): Includes intentional changes in consumption patterns in response to system conditions, prices, or agreements. To function in operation, it must typically be automated and have clear limits on when comfort, quality, or production must not be affected.
  • Demand-side management (DSM): Planned and monitored activities (typically by utility companies) to encourage consumers to change their consumption patterns. Here, the frameworks and signals are often more structured, but still require measurement, documentation, and accountability upon activation.

Methods for reducing peak power consumption with batteries, heating, and consumption flexibility

There are several ways to reduce peak power consumption, and the best solution depends on your load profile, your operational requirements, and the framework you are subject to (e.g., power tariffs and grid connection). In practice, it often makes the most sense to start with the few hours when the peak actually occurs and then choose measures that can deliver stable power limitation without creating new operational problems.

Battery energy storage (BESS) for reducing peak power demand

Battery storage can be used to store energy during low demand periods and discharge during peak demand periods. One example from Denmark is an urban battery storage project in Copenhagen from 2017, which supplies 630 kW via two 315 kW inverters and can power approximately 200 apartments during peak periods. Batteries can also contribute to frequency response and thus support grid stability.

From an operational perspective, the key is to define what the battery should "protect" you against: Is the goal to keep you below an internally set kW ceiling, to avoid a short, high peak when equipment is started up simultaneously, or to smooth out a repeated peak at certain times of day? The more specific the purpose, the easier it is to set the control and avoid unnecessary wear and tear.

Trade-off: Lithium-ion batteries degrade over time, typically after 1,000–3,000 full charge/discharge cycles, and intensive peak shaving can therefore affect service life and economy. Therefore, control should typically prioritize taking the "worst" peaks rather than running the battery hard in many small adjustments, unless this is a conscious choice in your operating strategy.

Thermal storage and heat pumps to support peak load reduction

Thermal storage can indirectly shift electricity consumption by producing heat when electricity prices are low and using the stored heat later. This can be an attractive alternative because thermal storage systems can have a long service life and, in some cases, be cheaper than batteries. Hybrid storage systems that combine multiple technologies have been shown to achieve efficiencies of 76–96% for large storage systems.

In practice, the approach is often to make "heat production" flexible, while keeping "heat delivery" to buildings or networks stable. This requires you to accept variations in when heat pumps or electric boilers run, without affecting temperature requirements. This is precisely where storage tanks and accumulation become a control tool: you can reduce electrical power during peak hours and instead produce heat at times when the load is lower.

A specific example from Denmark is a large seawater heat pump (177 MW heating capacity) combined with an electric boiler plant (150 MW) and four storage tanks with a capacity of 200,000 m³.

Consumption management and automation via EMS to reduce peak power consumption

Reduced peak power is rarely achieved consistently through manual intervention. An energy management system (EMS) can plan and execute control based on historical data, price or grid signals. This gives you a more consistent result because the rules are the same every time and because you can document why a given load was moved or limited.

In practice, this may include:

  • Price-based control: Consumption is activated when the electricity price is below a defined level. To avoid consumption simply shifting to a new, overall peak, limits and time windows should be coordinated with your other loads.
  • Network signal-based control: Activation based on signals from the network operator. This requires clear agreements on activation logic and an internal procedure for how operations can override if it conflicts with critical processes.
  • Time-based control: Planned reduction during known peak periods. This method is often simple to implement and works well when the peak is predictable, but should be adjusted on an ongoing basis if your operations change.

A Danish analysis shows that if 1,000 homes coordinate to delay hot water, underfloor heating, and panel heaters during peak hours, the grid load can be reduced by 4 MW. This illustrates the principle: many small adjustments can have a noticeable overall effect if they are managed consistently and at the right times.

Economics of reducing peak demand with power tariffs, dynamic pricing, and system services

The strongest economic driver is typically capacity charge/power tariff, where the cost depends on the maximum power (kW) in a period – often a month. An analysis shows that a single hour with a maximum of 90 kW can cost DKK 4,410 excluding VAT in a month, which illustrates why it is the peak that matters.

This means that, in practice, you should know your "billing logic": What period is the peak measured over, how is the maximum calculated, and what load typically drives your highest kW? Once this is clear, you can target your efforts at the hours that actually move the measured peak. This is often more valuable than general energy savings if the tariff is peak-based.

Dynamic tariffs (Time-of-Use) and real-time prices can also affect the incentive. The effect varies, and the incentive is generally greatest when prices are high and volatile – typically during periods of high demand such as cold winter days. A practical consequence is that the control strategy should be able to handle both planned patterns (known peak periods) and rapid fluctuations (price- or signal-based control) if you want to avoid shifting the problem from "kW peak" to "expensive hour."

In addition, flexibility can be valuable as system services, where Energinet purchases services such as FCR, aFRR, and mFRR. Denmark has reduced the minimum bid for aggregators to 1 MW, making it easier to gather smaller players into portfolios. For you, this may mean that a solution for reducing peak power can in some cases be designed so that it can also participate in flexibility deliveries if this suits your operations and requirements.

Rules and requirements affecting peak power reduction

At the transmission level, Energinet is responsible for security of supply. Energinet's plans indicate significant grid expansion towards 2030 (around 2,700 km of new transmission grid) and a further 3,000–4,000 km thereafter. At the same time, there are technical requirements for consumption sites via the Demand Connection Code (DCC). A key requirement is that consumption facilities must be able to perform manual load shedding within 15 minutes in peak or fault situations.

For you, this means that reducing peak power consumption is not only an economic project, but also a project with technical and organizational requirements: You must be able to identify which loads can be released, how this can be done safely, and who is responsible in a peak or fault situation. This should be clarified in procedures and—if you use automation—in management priorities and access to override controls.

The EU has also introduced "peak-shaving products" as a mechanism that can be activated automatically based on price limits or system requirements and must be purchased through competitive bidding with a minimum bid of no more than 100 kW. At the same time, these products must not be activated by starting fossil-based production behind the meter. This places demands on how flexibility is realized and on your ability to document that activation takes place within the framework.

Typical risks and pitfalls when reducing peak power consumption

Reducing peak power consumption can offer clear advantages, but the solution must be tailored to your operations and responsibilities to avoid creating new problems. The most common pitfalls involve managing too strictly, managing too uniformly, or underestimating wear and tear and damage. Here are the key risks—and typical ways to mitigate them:

  • Operational risk: Overly aggressive reduction can result in production losses or interruptions, especially where temperature and process stability are critical. The solution is to establish clear operational limits for what can be regulated, for how long, and with what override options. It should also be clear which loads are the "last" priority to regulate.
  • Oscillation: If many respond identically to the same price or network signal, the load may fluctuate (demand-side oscillation). Diversified strategies reduce the risk. In practice, this often involves introducing variation in start times, ramping, and prioritization so that not everyone turns on/off at the same time.
  • Battery wear: Intensive use can accelerate degradation and affect the business case. This highlights the need for a management strategy that is conscious of cycling and for peak reduction to be targeted at the hours that actually determine the maximum.
  • Market and framework barriers: Barriers may include a lack of smart meter deployment, pricing structures that do not send clear signals, technical requirements, and uncertainty about responsibility for activation. A practical remedy is to establish roles, data foundations, and activation logic before committing to a specific operating model.

When risks are managed early on, reducing peak demand typically becomes a more predictable operational discipline rather than an ad hoc measure that only works "sometimes."

How to tackle peak power reduction in practice

Reduced peak power requires a systematic approach, where the solution is matched to your load profile and operational requirements. The goal is to achieve a controllable, documentable, and reliable method that can be repeated month after month—not just a one-time adjustment.

A practical process typically looks like this:

  1. Data analysis: Identify when the peak occurs and which loads drive it (e.g., heating, process operation, or combinations). Look for patterns: start-up after weekends, simultaneous breaks, or specific outdoor temperatures that trigger high loads. The more precisely you can identify the "cause of the peak," the more targeted your control will be.
  2. Operating limits: Define what can be regulated down, for how long, and who can override. It should also be clear what is an acceptable consequence (e.g., short-term displacement) and what is not (e.g., process deviations or comfort disruptions). In this way, control is anchored in your operations rather than in a theoretical maximum.
  3. Choice of measures: Combine batteries, thermal storage, and consumption management according to need and flexibility. It often makes sense to start with the "low-hanging fruit" (planning and management) and then assess whether storage is necessary to handle the most critical peaks.
  4. Automation: Use EMS for consistent control rather than manual intervention. Automation makes it possible to maintain a power limit, respond quickly to signals, and log decisions so you can evaluate whether the control is working correctly.

Finally, you should ensure that there is a simple way to follow up on the effect: What was the maximum before and after, when did the peak occur, and what events triggered it? This makes it easier to adjust management and maintain the gains over time.

FAQ on reducing peak power consumption

  • What is peak power? Peak power is the highest simultaneous electrical load in a given period, typically measured in kW at customer level or MW at system level.
  • What is peak shaving? It is reducing the maximum load by controlling consumption or covering the peak with storage or local energy sources so that the peaks do not occur during the most critical hours.
  • Why is reducing peak demand important in Denmark? Because electrification (e.g., electric kettles, heat pumps, data centers, and transportation) increases power demand and can put pressure on production, transmission, and reserve capacity—especially on cold winter days.
  • How do power tariffs affect peak power reduction? Power tariffs mean that you pay for your maximum power consumption (kW) during the period, often on a monthly basis. A single peak hour can therefore have a significant impact on your total electricity bill.
  • What technologies are used to reduce peak power consumption? Typically battery storage, thermal storage (e.g., heat storage tanks combined with heat pumps/boilers), and demand response/consumption management via automated EMS solutions.
  • What risks should you be aware of when reducing peak power consumption? Typical risks include operational disruptions due to excessive downregulation, "oscillation" if many respond identically to signals, and battery degradation due to intensive cycling.

Contact us

Do you have questions or need advice? Our experts are ready to help you.

Contact support

If you would like to contact support, please call +45 35 153 123 or send an email to support@xolta.com.

Contact sales